Running a 50-bug, five-week warranty across a multi-app travel platform

Phase 2 had shipped across consumer, business and rental apps. I owned the warranty window: one ranked plan, daily visibility, and unblocking the releases that got stuck.

Role
Technical Project Manager
When
Mar 2026 — Present
Stack
Flutter · Node.js · React · JavaScript
warranty bugs owned
50
warranty bugs owned
fixed warranty window
5 wks
fixed warranty window
stakeholder status reports
Daily
stakeholder status reports

Context

A travel platform with a consumer (B2C) app, a business (B2B) app and a rental product running in multi-tenant and single-tenant setups — Flutter on mobile, Node.js and React behind it. Phase 2 had just gone live and entered a contractual warranty period.

The problem

  • Fifty warranty bugs were spread across several apps that share a backend, so a fix in one place could break another.
  • The warranty window was fixed at five weeks, and the client needed confidence every day that it would close cleanly.
  • An iOS App Store rejection blocked a release, and a B2B change had to land across several apps at the same time.

What I did

  1. 1

    One list, one priority order

    Pulled every reported bug into a single backlog and ranked it by user and business impact, then turned that into a priority resolution plan so the team always knew what to pick up next.

  2. 2

    Made progress visible every day

    Sent daily and weekly warranty status reports: what closed, what was in progress, and what was at risk. Stakeholders saw problems early instead of at the end of the window.

  3. 3

    Unblocked the iOS release

    Worked through the App Store rejection with the team — understood the review feedback, agreed the fix, and got the build resubmitted so the iOS release was back on track.

  4. 4

    Sequenced the cross-app rollout

    Coordinated the B2B change across the apps it touched so they shipped together, with no app running ahead of or behind the shared backend.

  5. 5

    Owned the technical calls

    Set the technical direction on fixes and trade-offs so the team didn't stall waiting for decisions.

Outcome

  • The warranty ran against one shared, ranked plan instead of scattered bug lists.
  • Stakeholders had a daily view of status and risk for the whole window.
  • The App Store rejection was resolved and the B2B rollout landed across apps in step.